The excess bookings surpassing the allocated target due to server issues on 28th April 2025, are rejected. Rejected cases may be resubmitted once availability is reinstated.
If there is any discrepancy in the subsidy value found while generating the permit, please mail to- ceagri.dafpo23@gmail.com.
The permit generation of electric pumps will only be possible for pumps with ISI/BEE labelled with minimum 4 star rated.